Temporary Road Closure
Dear Driver-Partners,
Do take note of the following road closure on
30 Aug and 31 Aug 2022 (Tue and Wed) from 12.30am to 5.30am. Temporary road closure of TPE (Changi) after Exit 2 & slip roads from Tampines Ave 7/Loyang Ave to TPE (Changi) TPE (Changi), after Exit 2
Slip roads from Loyang Ave & Tampines Ave 7 towards TPE (PIE)
Do familiarise yourself with alternate routes and drive safe!