HOEC says (in concall) Both the wells (oil and gas) in B 80 bl | DM Stocks
HOEC says (in concall) Both the wells (oil and gas) in B 80 block are fully operational and on continuous production mode All rectifications and repairs to B 80 block will be done before monsoon