From 28 to 30 May, the stop at A will not work!
In connection with the preparations for the V All-Russian Half Marathon ZABEG.RF, the shuttle way will slightly change!
The shuttle will stop at G, then drive along the D building, follow along GR3 and go straight to the stop at G on the road side!
An additional stop will still be at the GRZ!